Elmfield Road and Hop Brook Utilities Replacement

  1. Project Overview
  2. Project Status
  3. Project Photos

Elmfield Road and Hop Brook Utilities Replacement

The Elmfield Road and Hop Brook Utilities Replacement project was identified by the Wastewater Division through its routine maintenance and inspection of the collection system to be in need of replacement and/or rehabilitation. The Project includes the replacement of approximately 2,200 linear feet of severely corroded 8-inch asbestos cement  (AC) sewer pipe with 8-inch PVC  pipe along Elmfield Road and Griffin Road; abandonment and relocation of AC sewer pipe that crosses through wetlands adjacent to  Hemenway Road.; and trenchless lining of about 2,900 linear feet of sewer pipe in Eisenhower Road,  Hemenway Road and through an easement  behind houses on Hemenway Road.

In addition, nearly 1,500 linear feet of under-sized 6-inch water pipe along Elmfield Road and portions of Griffin Road will be replaced with 8-inch ductile iron pipe, along with associated service connections.

Construction on the project is scheduled to begin in the Summer of 2016 and is expected to continue through 2017.